Tools for
Woodwork

Plan the build

Projects and material planning

Work out a lumber budget and plan your cuts before you buy. This worksheet uses your actual supplier quote.

01 / Budget inputs

Estimate your lumber cost

Use your supplier's price per board foot, not an assumed species price.

02 / Estimated material cost

184.00

in your supplier's currency

Base volume: 20 bf

Allowance: 15%

Volume to budget: 23.00 bf

Before allowance: 160.00

Estimate only. Tax, delivery, milling, hardware and finish are not included.

Build the estimate from your boards

First, estimate the board feet of rough lumber you need for the project. Enter that number above with the price per board foot quoted by your supplier. Set an extra material percentage for cuts, defects and grain matching. The worksheet multiplies the increased volume by the price; it does not fetch prices or claim that any species has a fixed market cost.

If a project needs 20 board feet and you allow 15% extra, budget for 23 board feet. At a quoted price of 8 per board foot, the estimated lumber cost is 184 in the same currency as the quote. Check whether your supplier bills rough or surfaced dimensions and whether they include minimum board lengths, handling or milling charges.

What this estimate leaves out

This is a lumber-only budget. Tax, shipping, finish, glue, hardware, tool wear and replacement parts are separate. The extra-material percentage is your decision, not a universal recommendation. A project that needs matching figure or long clear parts may need more allowance than one made from short utility pieces.

Use the board foot calculator to check individual board volumes. Then use the cut-list planner to see whether the required part lengths fit the stock you can actually purchase. Neither calculation can identify defects in a real board, so confirm the order against the lumber rack before paying.